REST0006
Property Development & Feasibility Analysis
Term 2, 2024
Assignment No 3: Development Appraisal Report (weighting: 50% of the total; individual work; to be marked out of 100%)
> Submission due: Tuesday, 13 August 2024, 11:00 pm
Please submit your assignment online (in Word or pdf format) via the course Moodle platform. Other forms of submission or submission records, for example, via email or WhatsApp, are NOT accepted.
> Late submission: All assignments must be submitted by the due date/time. UNSW standard late submission penalty will apply 5% per day, capped at five days (including Saturday and Sunday) after which students cannot submit the assignment.
> Extensions for submission: Applications for special consideration regarding an extension for assignment submission or examination are now centrally assessed by the Case Review Team. Applications must be submitted online as soon as you encounter any problems before the due date. Application procedures can be found via
https://student.unsw.edu.au/special-consideration
The Brief
Assignment 3 is individual work. This is a continuation of Assignment 2 (development controls) in which you can make use of your findings on key planning requirements which affect the development design, and hence its gross realisation, development costs and feasibility.
Use the selected site in Assignment 2, which is situated in metropolitan Sydney and can accommodate a ‘shop top housing’ development with around 50 apartments and ground- floor retail shops. It should comprise 20% 3-bedroom apartments, 60 % 2-bedroom apartments and 20% 1-bedroom apartments. The site can be a single land lot or an amalgamation of several land lots.
The development should be completed within 12 months, as planned by the developer.
Using the Hypothetical Development Approach, determine what should be paid for the site.
Then conduct a Discounted Cashflow Feasibility (DCF) Analysis to determine the following:
. Development time frame.: pre-construction (lead-in period), construction and post- construction (selling period)
. Market analysis of economic market conditions and comparable prices
. Potential gross realisation value
. Likely development Costs
. Finance cost (interest; assume 100% debt)
. Profit margin excluding and including interest
. Internal Rate of Return before and after Interest
It is assumed that the planning authority has given positive support for this development after reviewing the preliminary design and planning concept in the pre-lodgement meeting.
All inputs and other assumptions should be fully given and explained.
All explanations and arguments should be properly cited and a list of references should be provided.
REST0006 Property Development & Feasibility Analysis
Assignment No 3 Cover Sheet
Title: REST0006 Assignment 3: Development Appraisal Report
CHECKLIST (please tick)
□ Cover sheet
□ BE Plagiarism Form.
□ Length and format of the report: 10 pages/2800 words max. (excluding the list of references), Times New Roman or Arial font, 12-point, 1.5 spacing
ASSESSMENT CRITERIA:
Criteria |
Mark |
Value |
Executive Summary A clear and concise overview of the main points/ key findings of the report Enable reader to make a decision based on reading the executive summary |
|
10% |
Market Analysis Macro and microeconomic market analysis; apartment and retail sale prices of recent comparable projects, comparable development site sales; local competition; SWOT analysis |
|
25% |
Hypothetical Development Approach Discussion on gross and net realisation values; profit margin, development costs and interest, land acquisition costs, GST liability and reclaims; residual land value |
|
25% |
DCF Model Discussion on: cashflow (outflows and inflows) over the entire development time frame (gross and net realisation, land costs, development costs, finance cost), GST liabilities and reclaims; profit margin, IRR, NPV, sensitivity analysis |
|
25% |
References and presentation Referencing, figures, tables, sketch plans, report structure (cover page, contents page, executive summary, introduction, main body, conclusions, list of references, appendices), proofreading |
|
15% |
TOTAL MARK |
|
/100 |
版权所有:编程辅导网 2021 All Rights Reserved 联系方式:QQ:99515681 微信:codinghelp 电子信箱:99515681@qq.com
免责声明:本站部分内容从网络整理而来,只供参考!如有版权问题可联系本站删除。